Post Olympic Work Starts

Post Olympic Work Starts
The lasting legacy of the London 2012 Olympics will depend on how the British industry handles the redevelopment...

London Olympics Host Largest Ever Temporary Structure

London Olympics Host Largest Ever Temporary Structure
The London Olympics highlight a growing trend in the architecture world: recyclable buildings.

London Bridge £440m Redevelopment

London Bridge £440m Redevelopment
It’s a little known fact, but London is the most congested city in all of Europe. While its...

Olympic Sized Upgrade | Kings Cross Station, London

Olympic Sized Upgrade | Kings Cross Station, London
London is undergoing a barrage of upgrades to cater for the impending 2012 Olympic Games to be held...

London Olympic Schedule | Aquatic Centre Complete

London Olympic Schedule | Aquatic Centre Complete
This past week media outlets have been filled with the absolute chaos that is unfolding in London and...

The Riot Aftermath | Rebuilding London

The Riot Aftermath | Rebuilding London
The evening of the August 6 was the start of a dark three day period for the UK,...
© 2012 DesignBuild Source. All rights Reserved. Reproduction without explicit permission is prohibited.